1. For the equipment with poor balance, it is suggested to add a load-bearing balance base to stabilize the equipment and prevent skew and bump.
2. Find an experienced driver and drive at a constant speed to ensure the safety of the equipment.
3. Suppose the equipment encountered is relatively high, and it can be fixed on both sides of the equipment and carriage with chain block and special rope tightening device, so as to facilitate transportation.
4. The equipment can be directly loaded and transported if its shape is relatively standard. However, if the equipment with special shape is assumed to be sensitive to loading, there are several points that need to be paid attention to: firstly, fix the force point; if it is easy to bump, shock absorption method must be adopted to prevent collision.
5. Assuming that the handling equipment is a fine instrument, the first thing to know is what is the fragile part of the instrument, and special care must be taken. Generally, cushion film, blanket and other shock absorption methods are selected, and attention should be paid to handling when using lifting equipment.
Common sense analysis of several details in hoisting process
1. Hoisting machinery and crane:
Lifting machinery is widely used in lifting, transportation, loading and unloading, equipment and personnel transportation and other operations, which is indispensable for modern industrial production.
Crane is a kind of mechanical equipment which is used intermittently and repeatedly to lift, descend, lift and transport materials through lifting hook or other lifting appliances.
2. Terms related to crane structure:
(1) steel structure: main beam, end beam (crossbeam), trolley frame, outrigger, lower crossbeam, jib, balance arm, column, gantry, tie rod, tower body, walking platform and cab, etc. Shandong hoisting service hoisting construction in Shandong
(2) transmission organization: lifting organization, operation organization, rotary organization, luffing organization and jacking organization, etc.
(3) electrical system: handheld controller, conductive equipment, cable reel, resistance box, frequency converter and control cabinet.
(4) main components: crane, grab, lifting electromagnet, steel wire rope, ring chain, pulley, drum, brake, wheel and track, etc.
The above is "lifting equipment handling different items have different methods" with Guangdong lifting equipment rental section to provide analysis!
Article source: Guangdong lifting equipment rental http://www.jmzhongte.com
04-23
Common faults and repair methods of hoisting equipment rental in Guangdong
Guangdong lifting equipment in the operation, it is inevitable to encounter crane failure and affect the use of the situation, then the fault maintenance has become a necessary means of disposal. There are three kinds of common faults of Guangdong hoisting equipment rental crane, and the correspondi
04-23
What are the advantages of aerial vehicle in aerial vehicle operation
Specific configuration of aerial work vehicle: Hydraulic 360 ° full rotation, three folding arms, single hydraulic lifting cylinder, with bidirectional balance valve. Electrically operated boom. With 1 ton retractable hook, four hydraulic cylinders, adjustable legs, with two-way hydraulic lock (out
04-13
Analysis of the reason why the electric hoist of Guangdong hoisting equipment can not operate
Guangdong lifting equipment electric hoist can not run the reason analysis 1, can first check the equipment power fuse is burned, if one phase, so its electric hoist can not rotate, the starting torque of the crane electric hoist is zero, so the motor of the equipment will not run, it is necessary to replace enough fuse. 2. What's more, the voltage of the power grid is too low, so the dynamic torque of the equipment is proportional to the square of the voltage. The acceleration torque can not ov
04-13
Jiangmen high altitude equipment rental tells you the harm of overload operation
The excessive stress caused by overload operation of Jiangmen high-altitude equipment can break the wire rope, damage the transmission parts and burn the motor. Due to the insufficient braking force, the brake can not hold the brake, which will cause serious accidents. Overload operation has great damage to the crane structure, such as the main beam deflection, cracks and desoldering on the upper cover plate and web plate, which brings serious accident risks to the high-altitude equipment operat