Some peers have analyzed that the shaking of aerial work vehicle is due to the problem of luffing cylinder swing. The luffing mechanism is the same as that of truck crane. In the range of 75-60 degrees, there will be shaking. In this case, will receive alternating load is obvious, impact is big, add throttle, can try. This problem can be solved by constantly changing the throttle diameter.
In addition, it can be relied on in the process of use
The opening of the balance valve comes from oil. When it reaches a certain angle, the load borne by the balance valve may fluctuate. The oil overflow of the balance valve fluctuates, causing shaking. Xinxiang rental aerial work vehicle can try to increase the setting value of the balance valve to ensure that the shaking is reduced when opening and passing oil.
In fact, there are many reasons for the shaking in the process of high-altitude operation, and everyone's statement is different. We can try it slowly and find a solution.
Source: Jiangmen aerial vehicle rental http://www.jmzhongte.com
04-23
Common faults and repair methods of hoisting equipment rental in Guangdong
Guangdong lifting equipment in the operation, it is inevitable to encounter crane failure and affect the use of the situation, then the fault maintenance has become a necessary means of disposal. There are three kinds of common faults of Guangdong hoisting equipment rental crane, and the correspondi
04-23
What are the advantages of aerial vehicle in aerial vehicle operation
Specific configuration of aerial work vehicle: Hydraulic 360 ° full rotation, three folding arms, single hydraulic lifting cylinder, with bidirectional balance valve. Electrically operated boom. With 1 ton retractable hook, four hydraulic cylinders, adjustable legs, with two-way hydraulic lock (out
04-13
Analysis of the reason why the electric hoist of Guangdong hoisting equipment can not operate
Guangdong lifting equipment electric hoist can not run the reason analysis 1, can first check the equipment power fuse is burned, if one phase, so its electric hoist can not rotate, the starting torque of the crane electric hoist is zero, so the motor of the equipment will not run, it is necessary to replace enough fuse. 2. What's more, the voltage of the power grid is too low, so the dynamic torque of the equipment is proportional to the square of the voltage. The acceleration torque can not ov
04-13
Jiangmen high altitude equipment rental tells you the harm of overload operation
The excessive stress caused by overload operation of Jiangmen high-altitude equipment can break the wire rope, damage the transmission parts and burn the motor. Due to the insufficient braking force, the brake can not hold the brake, which will cause serious accidents. Overload operation has great damage to the crane structure, such as the main beam deflection, cracks and desoldering on the upper cover plate and web plate, which brings serious accident risks to the high-altitude equipment operat