The pulley block is a crane equipment composed of several fixed pulleys and movable pulleys wound by galvanized steel wire rope. It has the advantages of fixed pulley and movable pulley, which can save strength and change the compression direction of galvanized steel wire rope. The following Guangdong lifting equipment rental section will introduce the relevant application knowledge of pulley block for you:
(1) classification of pulley block
The pulley block can be divided into single pulley block and double connected pulley block according to its structure, and can be divided into energy saving pulley block and growth speed pulley block according to its functional characteristics. The hoisting organization of the crane adopts single link and energy saving pulley block. One end of the galvanized steel wire rope is fixed at the end of the lifting hook or lifting arm beam, and the other end is wound from the pulley block. According to the guiding movable pulley, it is wound on the wire rope drum.
The application of the economizer pulley block, the energy saving level, the total number of movable pulleys and the galvanized steel wire rope threading shall be considered
It depends on the method. For the single pulley block, the energy saving level lies in the multiple of the pulley block, the multiple is 2, and the saving force is half (without considering the friction resistance of the moving pulley); when the multiple is 4, only 1 / 4 of the load is required.
(2) threading and winding of galvanized steel wire rope for pulley block
When the galvanized steel wire rope is wound on the pulley block, it should be wound in a certain order. The winding methods include forward winding, reverse winding, 2 rope winding and 4 rope winding.
The hoisting pulley block galvanized steel wire rope at the crane shall be wound in sequence. From the pulley block; 11 wire rope head is called walking head or running head. In hoisting, it is indicated that the structure of pulley block is commonly used in terms of one two four, two two four, one one two, and their meanings are respectively expressed as follows: a pulley block consisting of one fixed pulley and two moving pulleys with four downflow ropes; a pulley block composed of two fixed pulleys and two movable pulleys with four Ding ropes; one with two fixed pulleys and two movable pulleys with four ropes; A pulley block consisting of a fixed pulley and a movable pulley with two Ding ropes. Cranes with small lifting weight usually use pulley blocks of four or two-one-three; cranes with heavy lifting mostly use two-two-way-four pulley blocks.
(3) key points of application of movable pulley and pulley block
(1) before application, check the allowable load of the movable pulley or pulley block, check whether there is any gap damage in the groove, shaft tenon, straight hair splint, lifting hook (or eyebolt) of the movable pulley, and whether the rotation of the movable pulley is convenient. It can be applied if it is good.
(2) after the pulley block is put in, the force shall be increased slowly. After the rope is tightened, check whether each part is in good condition and whether there is any place for rope sticking. If there is any improper place, it can be applied after adjustment.
(3) the core of the lifting hook (or eyebolt) of the movable pulley should be on a plumb line with the point where the prefabricated component is lifted to prevent instability after hoisting. The distance between the left and right moving pulleys of the pulley block shall be determined according to the actual situation, generally 700? 1200 mm.
(4) before and after application, the movable pulley should be cleaned and cleaned, and the shaft tenon should be oiled to make it rotate easily and reduce damage and induced corrosion.
Article source: Guangdong lifting equipment rental http://www.jmzhongte.com
04-23
Common faults and repair methods of hoisting equipment rental in Guangdong
Guangdong lifting equipment in the operation, it is inevitable to encounter crane failure and affect the use of the situation, then the fault maintenance has become a necessary means of disposal. There are three kinds of common faults of Guangdong hoisting equipment rental crane, and the correspondi
04-23
What are the advantages of aerial vehicle in aerial vehicle operation
Specific configuration of aerial work vehicle: Hydraulic 360 ° full rotation, three folding arms, single hydraulic lifting cylinder, with bidirectional balance valve. Electrically operated boom. With 1 ton retractable hook, four hydraulic cylinders, adjustable legs, with two-way hydraulic lock (out
04-13
Analysis of the reason why the electric hoist of Guangdong hoisting equipment can not operate
Guangdong lifting equipment electric hoist can not run the reason analysis 1, can first check the equipment power fuse is burned, if one phase, so its electric hoist can not rotate, the starting torque of the crane electric hoist is zero, so the motor of the equipment will not run, it is necessary to replace enough fuse. 2. What's more, the voltage of the power grid is too low, so the dynamic torque of the equipment is proportional to the square of the voltage. The acceleration torque can not ov
04-13
Jiangmen high altitude equipment rental tells you the harm of overload operation
The excessive stress caused by overload operation of Jiangmen high-altitude equipment can break the wire rope, damage the transmission parts and burn the motor. Due to the insufficient braking force, the brake can not hold the brake, which will cause serious accidents. Overload operation has great damage to the crane structure, such as the main beam deflection, cracks and desoldering on the upper cover plate and web plate, which brings serious accident risks to the high-altitude equipment operat